...Title
Agreement with Steve P. Rados, Inc., for Design and Construction of Fourth Street 84-inch Interceptor Phase VI-A Project.
...Recommendations
Adopt a resolution:
(a) Approving the final rankings of the design-build entity that responded to the Request for Proposals for the 4880 - Fourth Street 84-inch Interceptor Phase VI-A Project (“Project”); and
(b) Authorizing the Director of Public Works to negotiate a Design-Build contract for the Project with Steve P. Rados, Inc.
CEQA: Determination of Consistency with the Mitigated Negative Declaration for Sewer Interceptor Phase VIA Public Project (Resolution No. 77626), File No. PP10-160. (Public Works)
(Deferred from 11/7/17 - Item 2.9 to 11/28/17)