...Title
H20-026 - Administrative Hearing on the Environmental Appeal of the Eterna Tower Mixed-Use Development Project Addendum to the Downtown Strategy 2040 Final Environmental Impact Report.
...Recommendations
(a) Conduct an Administrative Hearing to consider the environmental appeal of the Planning Director’s reliance on the Eterna Tower Mixed-Use Development Project Addendum to the Downtown Strategy 2040 Final Environmental Impact Report in accordance with the California Environmental Quality Act (CEQA) for a Site Development Permit (File No. H20-026), to allow the demolition of two on-site two-story buildings and allow the construction of a 26-story, approximately 184,667-gross square foot mixed-use building consisting of 192 residential units and 6,644 square feet of commercial space, on an approximately 0.18-acre site.
(b) Adopt a resolution denying the environmental appeal and upholding the Planning Director’s reliance on the Eterna Tower Mixed-Use Development Project Addendum to the Downtown Strategy 2040 Final Environmental Impact Report in accordance with the California Environmental Quality Act, as amended, and finding that:
(1) The City Council has independently reviewed and analyzed the Addendum for the Eterna Tower Mixed-Use Development Project, and related administrative record related to Site Development Permit No. H20-026; and
(2) The Addendum for the Eterna Tower Mixed-Use Development Project was prepared and completed in full compliance with the CEQA of 1970, as amended, together with State and local implementation guidelines; and
(3) Reliance on the Addendum for the Eterna Tower Mixed-Use Project reflects the independent judgment and analysis of the City of San José, as lead agency for the Project; and
(4) Preparation of a new, subsequent, or supplemental environmental document is not required because the appeal does not raise any new significant impacts that have not already been analyzed or addressed in the Eterna Tower Mixed-Use Project Addendum and none of the following events occurred as outlined in Section 21166 of Public Resources Code (PRC):
(i) substantial changes are proposed in the project which will require major revisions of the environmental report;
(ii) substantial changes occur with respect to the circumstances under which the project is being undertaken which will require major revisions in the environmental impact report; or
(iii) new information, which was not known and could not have been known at the time the environmental impact report was certified as complete, becomes available. Further, a new, subsequent, or supplemental environmental impact report is not required because no impacts outside the scope of the Downtown Strategy 2040 EIR were identified in Section 15168 of the CEQA Guidelines.
CEQA: Eterna Tower Mixed-Use Development Project Addendum. Council District 3. (Planning, Building and Code Enforcement)